As part of the construction and safety compliance standards for the Mall of Sousse commercial complex, SKCMM was selected to design, fabricate, and install a major emergency egress framework. The project required the manufacturing and high-elevation erection of a 22-meter-high hot-dip galvanized steel emergency staircase. Fully compliant with stringent building safety codes for high-traffic public venues, the hot-dip galvanization guarantees maximum protection against coastal weathering and corrosion. Delivered with strict safety and quality standards, the project was successfully completed within a 130-day timeline.
Period: January 2018 – May 2018
Client: Mall of Sousse
Location: Sousse
Category: Metal staircases