
To support the expansion of mining and industrial storage operations for SOFAP (a subsidiary of the Hammami Group), SKCMM was selected to carry out the structural steelwork for a large-scale facility in Sfax. The scope included the workshop fabrication and site installation of a heavy-duty steel roof frame anchored to reinforced concrete shear walls, spanning a total area of 3,000 sqm with a clear span of 24 meters. This design maximizes internal operational clearance by eliminating internal columns, tailored specifically for mining sector requirements. The entire construction was executed within a tight 50-day completion period.
Period: June 2021 – November 2021
Client: Sofap
Location: Sfax
Category: Metal frames