
As part of the facility expansion for For Clean, a company operating in the detergent manufacturing industry, SKCMM successfully delivered an industrial structure in Sfax, Tunisia. SKCMM managed the entire scope, including steel structure manufacturing and expert steel erection on site. The facility features a robust lattice steel structure with a clear span of 28 m, covering an overall area of 1,000 sqm. Built in accordance with high standards of steel construction, this industrial steel structure maximizes column-free internal space for chemical product manufacturing and storage. The complete project was carried out within a strict execution period of 40 days.
Period: March 2024 – May 2024
Client: For Clean
Location: Sfax
Category: Metal frames